EXPERIENCE IN RESIDUAL LIFE ASSESSMENT STUDY

 

PART-I (BOILER & AUXILIARIES)

 

Year

Name of the Work

Work Order Reference No

 

Name and Address of Client

10-11

1.      Remnant Life Assessment Study of Boiler No. 4.

W.O.No.: B/10-11/82 dated 09/07/2010

Indian Metals & Ferro Alloys Limited, Choudwar-754 071, Cuttack, Orissa

2.      Remaining Life Assessment Study of Unit-IV.

P.O.No.: 4000046938-053-1010 dated 09/07/2010

NTPC Limited

Badarpur Thermal Power Station

Badarpur, New Delhi

3.      Remaining Life Assessment (RLA) Test of 70 TPH Boiler.

W.O.No.: KC:CPD:TPH:CON:433 dated 06/07/2010

Kesoram Cement

Kesoram Industries Limited

Karimnagar, A.P.

4.      RLA Study of Boiler Pressure Parts of WHRB #2 & #3.

P.O.No.: 4000045430-050-1014 dated 19/06/2010

NTPC Limited

National Capital Power Station

Dadri (U.P.)

5.      Residual Life Assessment/Life Extension Study of Boiler and ESP Performance Test in 210 MW Unit No. 6.

P.O.No.: GC 4874/CEG-I/SE(R&M)/Dr. NTTPS (Stage-III)/RLA Study/D.No. 83/10 dated 01/06/2010

A.P. Power Generation Corporation Limited

Dr. NTTPS (VTPS)

Vijayawada, AP

6.      Residual Life and Condition Assessment Studies (RLA) of Boiler of Unit-II & III during Overhauls 2010-11.

P.O.No.: 4000042202-053-1033 dated 15/04/2010

NTPC Limited

Ramagundam Super Thermal Power Station, Jyotinagar, AP

09-10

1.      RLA Study of Coal Fired Boiler No. 1.

P.O.No.: 50002611/M03 dated 18/03/2010

The Andhra Pradesh Paper Mills Limited

Rajahmundry, Andhra Pradesh

2.      RLA & Life Extension of OR-450 WHB System.

P.O.No.: 4500020880 dated 10/03/2010

Paradeep Phosphates Limited

PPL Township

Paradeep: 754145

 

3.      RLA Study of Boiler # 6

W.O.No.: 14031178/1049/3660 dated 03/03/2010

Hindalco Industries Limited Renusagar Power Division Renusagar, Sonebhadra (UP)

 

4.      RLA Study of Boiler # C

W.O.No.: 2500005422 dated 06/02/2010

Zuari Industries Limited

Zuari Nagar, GOA

 

5.      Residual Life Assessment of 210 MW Boiler.

BTPS/OMC/900599/2009-10/

143/7767 dated 11/01/2010

NTPC Limited

Badarpur Thermal Power Station

Badarpur, New Delhi

 

6.      RLA Study of Boiler Stage-2 (2x500MW) at NTPC-Farakka.

PO No.: 4000036865-050-1024/238 dated 15/01/2010

NTPC Limited

Farakka Super Thermal Power Station

 

7.      Remnant Life Assessment Study of Boiler No. 2.

B/09-10/216 dated 30/11/2009

Indian Metals & Ferro Alloys Limited, Choudwar-754 071, Cuttack, Orissa

 

8.      RLA Study as per Indian Boiler Regulations with latest Amendments for Coal Fired Boiler No. 4 (MP-2837) & Coal Fired Boiler No. 5 (AP-1738).

W.O.No.: 50002385/ M03 dated 16/11/2009

The Andhra Pradesh Paper Mills Limited

Rajahmundry, Andhra Pradesh

 

9.      RLA Study of Unit I Boiler.

SE/R&M/TTPS/F.RLA/2009-10/

D.265/2009 dated 24/11/2009

Tamilnadu Electricity Board

Thoothukudi Thermal Power Station, Thoothukudi

 

10.  Contract for Residual Life Assessment (RLA) Study for WHRB #3 and #4.

P.O. No.: 4000032050-050-1012 dated 23/10/2009

NTPC Limited

Auraiya Gas Power Station

Auraiya (U.P.)

 

11.  Residual Life Assessment of 95 MW Unit.

P.O.No.: 4000026944-050-1010/6240 dated 01/09/2009

NTPC Limited

Badarpur Thermal Power Station

Badarpur, New Delhi

Year

Name of the Work

Work Order Reference No

 

Name and Address of Client

 

12.  Residual Life Assessment Study of one 500 MW Boiler (Unit #6).

P.O.No.: 4000028263-053-1004 dated 21/08/2009

NTPC Limited

Singrauli Super Thermal Power Station, Sonebhadra (U.P.)

 

13.  Complete Residual Life Assessment Study and Inspection Activities of 151 TPH CFBC Boiler.

W.O.No.: 8802598 dated 19th Aug, 2009

NAVA Bharat Ventures Limited

Paloncha, Khammam Distt.

Andhra Pradesh

14.  Remaining Life Assessment of 75 TPH Russian Boiler at Gujarat Refinery.

W.O.No.: 17967292 dated 16/07/2009

Indian Oil Corporation Ltd.

Gujarat Refinery,

Vadodara, Gujarat

15.  RLA Study of Coal Fired Boiler No. 2 (Ap-701) & Coal Fired Boiler No. 3 (MP-2839) as per Indian Boiler Regulations.

P.O.No.: 50002172/M03 dated 09/07/2009

The Andhra Pradesh Paper Mills Limited

Rajahmundry,

East Godavari Distt. (A.P.)

16.  Residual Life Assessment Study on Boiler-2 in TPS-II.

LOI No.: TS-II/Cont/BM/T.No.3467

/5147/2009 dated 07/07/2009

Neyveli Lignite Corporation Limited, Thermal Power Station-II, Neyveli, Tamil Nadu

17.  Remaining Life Assessment and Condition Assessment (RLA & CA) of SG-3.

LOI No.: HWPM/MU/2009/BG/111 dated 23/06/2009

Department of Atomic Energy

Heavy Water Plant, Manuguru

Andhra Pradesh

18.  Remaining Life Assessment Study (RLA) of 3 Nos. of Boilers (J.T. Boiler, T.V. Boiler & Oscatz Boiler).

W.O.No.: 02/09/M4/1001 dated 02/06/2009.

The Andhra Sugars Limited

Tanuku, Andhra Pradesh

19.  Residual Life Assessment of Boiler and Associated System of any one unit of 110 MW at NTPC-Tanda.

P.O.No.: 4000021475-050-1007/853 dated 07/05/2009

NTPC Limited

Tanda Thermal Power Station

Vidyut Nagar, U.P.

20.  RLA Study of Boiler #1 (80 TPH WIL Boiler) for IBR 391-A, Table –I.

W.O.No.: CC/AMC/09-10/006 dated 16/04/2009.

Hindalco Industries Limited

Renukoot, Sonebhadra, U.P.

08-09

1.      NDT of Drums and Headers of Russian Boilers of Power and Blowing Station.

W.O.No.: DGM/CC/CAM/2132/PP-I/OT/PA/312/2008/1116 dated 20/03/2009

Steel Authority of India Ltd.

Bhilai Steel Plant

Bhilai, Chhattisgarh

Year

Name of the Work

Work Order Reference No

 

Name and Address of Client

 

2.      Remaining Life Assessment of Steam Generator (SG Boiler) of Power Plant.

W.O.No.: WO/A1/RS/20081010 dated 20th February 2009.

Indian Farmers Fertilizer Cooperative Limited

Aonla Unit, Bareilly, U.P.

3.      Residual Life Assessment (RLA) test for Six John Thomson Fired Boilers.

P.O.No.: 763/4500132454 dated 24/01/2009

The Sirpur Paper Mills Limited

Sirpur Kaghaznagar, A.P.

4.      Residual Life Assessment Study on Boiler-3 in TPS-II.

LOI No.: SII/CONT/BM/T.NO.3416

/5131/2008 dated 17/12/2008

Neyveli Lignite Corporation Limited, Thermal Power Station-II, Neyveli, Tamil Nadu

5.      Remaining Life Assessment and Condition Assessment (RLA & CA) of SG-2.

LOI No.: HWPM/MU/2008/BG/98 dated 27/11/2008

Department of Atomic Energy

Heavy Water Plant, Manuguru

Andhra Pradesh

6.      RLA Study of Stage-I Boilers.

P.O. No.: 4000011182-053-1027 dated 24/11/2008

NTPC Limited

Talcher Thermal Power Station

Angul, Orissa

7.      RLA Study of 2 Nos. (1 x 32 TPH and 1 x 36 TPH) Steam Boilers.

W.O.No.: Comml/Cntr/2008-2009/9430 dated 18/11/2008

BILT Graphic Paper Products Limited, Kamalapuram

8.      RLA Study of 75 MT/Hr. capacity Russian Boilers (B-1 & B-2) at Barauni Refinery.

W.O.No.: 17816698/2394 dated 18/09/2008

Indian Oil Corporation Limited

Barauni Refinery

Begusarai, Bihar

9.      RLA Study of 2 x 145 TPH CFBC Boilers at Hindalco Industries Limited-Hirakud.

P.O.No.: 900818/JE1213 dated 22/09/2008

Hindalco Industries Limited

Hirakud (Orissa)/ ISGEC John Thompson

10.  Remnant Life Assessment of Coal Fired Boilers (3 Nos.)

P.O.No.: 561704 dated 08/09/2008

Hindustan Newsprint Limited

Kottayam, Kerala

11.  RLA Study of 2 Nos. WHRBs of 108 MW Rithala CCPP as per IBR Act 1950 Clause 391 A and submission of reports approved by CIB, Delhi.

P.O.No.: 3500003211 dated 09/09/2008

North Delhi Power Limited (A TATA Power and Delhi Government Joint Venture)

Rithala, New Delhi

Year

Name of the Work

Work Order Reference No

 

Name and Address of Client

 

12.  RLA Study of Boiler No. 2 and RLA Study of Main Stream Line Header.

W.O.No.: HP/22/22/0600/06CE0742

/WO 20860 dated 21/08/2008

Krishak Bharati Cooperative Limited, Kribhco Nagar,

Surat, Gujarat

13.  Work of Condition Assessment and Residual Life Assessment Study of WHRB (Boiler), Unit No. 2 (GT 3132 & GT 3133) of GBPS, Utran.

W.O.No.: UGBPS/MECH II/BMD/

RLA-BOILER #2/2008/3935 dated 21/08/2008

Gujarat State Electricity Corporation Limited,

Gas Based Power Station, Utran

14.  Carrying out Residual Life Assessment (RLA) in Unit-I during 2008-09 Overhauls and Piping Stress Analysis.

P.O. No.: 4000006605-053-1033 dated 29/08/2008

NTPC Limited

Ramagundam Super Thermal Power Station

Andhra Pradesh

15.  RLA of 95 MW Unit.

LOA No.: 300010/BTPS/OMC/0809

/21 dated 23/07/2008

NTPC Limited

Badarpur Thermal Power Station

Badarpur, New Delhi

16.  Remaining Life Assessment Study of Boiler Pressure Parts.

W.O.No.: CPP/CNT/MC-3163/WO/

2008/1934 dated 01/07/2008

National Aluminium Company Limited, Angul (Orissa)

17.  Residual Life Assessment Study of Boiler & Auxiliaries in one unit of 500 MW.

LOA No.: C&M/11079 dated 13/06/2008

NTPC Limited

Singrauli Super Thermal Power Station, Shaktinagar (U.P.)

18.  Remaining Life Assessment & Condition Assessment (RLA & CA) of SG # 1.

W.O.No.: HWPM/MU/2007/BG/71 A/ R1 dated 12/06/2008

Department of Atomic Energy

Heavy Water Plant, Manuguru

Andhra Pradesh

19.  RLA Study of Service Boiler.

P.O.No.: 4720000693 dated 22./04/2008

TATA Chemicals Limited

Babrala, (U.P.)

07-08

1.      Remnant Life Assessment (RLA) of 01 No. Heat Recovery Steam Generator (HRSG #1) of Power Plant.

W.O.No.: 4110/268/S&P 582/IW/07/

1032 (X) dated 18/01/2008

Indian Farmers Fertilizers Cooperative Limited

Aonla Unit, Bareilly

2.      Residual Life Analysis of Boiler ‘A’

W.O.No.: ZIL/PURAIK/24350 dated

04/12/2007

Zuari Industries Limited

Zuarinagar, GOA

3.      Remnant Life Assessment Study of Boiler No. 3.

W.O.No.: B/07-08/117 dated 21/11/2007

Indian Metals & Ferro Alloys Ltd., Cuttack (Orissa)

Year

Name of the Work

Work Order Reference No

 

Name and Address of Client

 

4.      RLA of Boiler and Associated System of any one Unit of 110 MW.

W.O.No.: NTPC/TD/CS/24/3294/

LOI-2975/675 dated 07/11/2007

NTPC Limited

Tanda Thermal Power Station

Vidyut Nagar (U.P.)

5.      RLA Study of KTI Boiler at Cogeneration Plant, Hazira.

HZR/OPS/AM5/58/07-08 dated 17/10/2007

Oil & Natural Gas Corporation Limited, Cogeneration Plant

Hazira (Gujarat)

6.      RLA/LE Study of complete Boiler for Unit 1 & 3, Turbine and its Critical Piping for Unit No. 4.

CEG/340/KTPS-A/Unit No. 1, 3&4/

RLA/LE Study/Spec. 10/2007/D.No. 471/07 dated 05/10/2007

A.P. Power Gen. Corp. Ltd.

Kothagudem Thermal Power Station, Khammam,

Andhra Pradesh

7.      RLA Study of 2 Nos. of Boilers.

SSK/PUR/ENG/136/1378/07-08 dated 04/10/2007

Sanjivani Sahakari Sakhar Karkhana Limited (GOA)

8.      RLA Test of Boilers No. 09, 10, 11 & 12.

W.O.No.: bk/2449 dated 19/07/2007

Saraswati Sugar Mills Ltd.

Yamuna Nagar (Haryana)

9.      RLA Study of Boiler Pressure Parts, Auxiliaries Piping and Structures in #4.

08/CS1/TH/BMD/MTC/3239/LOI-188/2007

NTPC Limited

National Capital Power Station

Dadri (U.P.)

10.  RLA Study of Pressure Parts of Boiler # 3, Type VU-60 of BHEL Capacity 150 TPS.

Award Letter No.: 7013/OA-7011 dated 25/07/2007

NTPC-SAIL Power Company Private Limited

Bhilai, Chhattisgarh

11.  Condition Assessment Study of Unit V & VI Boiler Components during Overhaul 07-08.

W.O.No.: 13680 dated 29/06/2007

NTPC Limited

Ramagundam Super Thermal Power Station

12.  RLA of Boiler of 210 MW (Unit 1 & 4) of Stage-I.

KhS:092:CS:O&M/1001/2656/631 dated 13/06/2007

NTPC Limited

Kahalgaon Super Thermal Power Station

Bhagalpur, Bihar

Year

Name of the Work

Work Order Reference No

 

Name and Address of Client

 

13.  RLA of Waste Heat Boiler.

HCL/KCC/SMLT/MECH/646/2007 dated 19/05/2007

Hindustan Copper Limited

Khetri

06-07

1.      RLA Study of Pressure Parts of Boiler # 2, Type VU-40 of BHEL Capacity 150 TPS.

Award Letter No.: 6101/OA-6033 dated 24/02/2007

NTPC-SAIL Power Company Private Limited

Bhilai, Chhattisgarh

2.      RLA/LE Study of Boilers, Turbines & Auxiliaries of Unit No. 2 (210 MW).

GC 4345/CEG/112/VTPS-I/D.N. 9/07 dated 10/01/2007

A.P. Power Generation Corporation Limited

Vijayawada, Andhra Pradesh

3.      RLA Study of 140 MW Boilers of Stage-II Units, Dhuvaran.

DTPS/AC/Works/173/BMD/6296 dated 05/12/2006

Gujarat State Electricity Corporation Limited

Dhuvaran Thermal Power Station, Gujarat

4.      NDT/RLA of CO Boiler at KRL.

UPL/1860/KRL/RLA dated 17/11/2006

Kochi Refineries Limited

Ernakulam, Kerala

5.      RLA Study of Boiler No. 1

B/06-07/121 dated 27/10/2006

Indian Metals & Ferro Alloys Limited, Cuttack (Orissa)

6.      RLA Study of # 1 Boiler & Pressure Parts at Ib TPS (210 MW).

ITPS/CC-EL-197 (H)/709/WI dated 18/08/2006

Orissa Power Generation Corporation Limited

Ib Thermal Power Station

Jharsuguda

7.      RLA Study of Boiler No. 10615 in Ammonia V Plant of RCF, Trombay Unit.

UPL/RCFL/RLA/02 dated 05/05/2006

Rashtriya Chemicals & Fertilizers Limited

Bombay/ UPL

05-06

1.      RLA Study of Boiler No. 10236 of MP-Nitric Acid Plant of RCF, Trombay Unit.

UPL/RCFL/RLA/01 dated 06.02.2006.

Rashtriya

Chemicals & Fertilizers Ltd., Mumbai

2.      RLA of 1 No. of HRSG of Power Plant at IFFCO.

UPL/1842/IFFCO/RLA dated December 12, 2005

Indian Farmers Fertilizers Cooperative Limited

Bareilly, (U.P.)

Year

Name of the Work

Work Order Reference No

 

Name and Address of Client

 

3.      RLA/LE Study of Boiler No. 5, GT-2391 of IOP Plant at Vadodara (Gujarat).

UPL/1829-A/IPCL/RLA dated December 8, 2005.

Indian Petrochemicals Corporation Ltd.,

Vadodara (Gujarat)

4.      RLA Study of 1 x 110 MW (6th Unit) of Boiler at DPPS/DPL.

UPL/1849/DPL/RLA dated December 8, 2005.

DPPS, Durgapur

 

5.      RLA of Waste Heat Recovery Boiler (WHRB # 1) of 210 TPH (50 MW) rating of MHI Make.

UPL/1815/NTPC/RLA dated August 31, 2005.

NTPC Limited

Auraiya Gas Power Station

Auraiya, (U.P.)

6.      RLA of Waste Heat Recovery Boiler (WHRB # 2) of 210 TPH (50 MW) rating of MHI Make.

UPL/1815/NTPC/RLA dated July 15, 2005.

NTPC Limited

Auraiya Gas Power Station

Auraiya, (U.P.)

7.      RLA Tests in Boiler Nos. GT-1618 & GT-1619.

UPL/1843/SKVSKUML/RLA dated June 11, 2005.

Shree Kamrej Vibhag Sahakari Khand Udyog Mandli Ltd.,

Surat (Gujarat)

04-05

1.      RLA of Waste Heat Recovery Boiler (WHRB # 4) of 210 TPH (50 MW) rating of MHI Make.

UPL/1815/NTPC/RLA dated July 15, 2005.

NTPC Limited

Auraiya Gas Power Station

Auraiya, (U.P.)

2.      RLA Study of VU-40, Boilers No. 2 & 3 of Phulpur Unit 1.

UPL/1811/IFFCO/RLA dated February 10, 2005.

Indian Farmers Fertilizers Cooperative Limited

Phulpur

3.      RLA Study of Power Boiler at Mathura Refinery.

UPL/1807/IOCL/RLA dated December 2, 2004.

Indian Oil Corporation Limited

Mathura Refinery

4.      RLA Study of Boiler

UPL/1831/Reliance-Hazira/RLA dated December 2, 2004

Reliance-Hazira Plant (Gujarat)

5.      RLA of Waste Heat Recovery Boiler (WHRB) of 210 TPH (50 MW).

UPL/1815/NTPC/RLA dated September 1, 2004.

NTPC Limited

Auraiya Gas Power Station

Auraiya, (U.P.)

Year

Name of the Work

Work Order Reference No

 

Name and Address of Client

 

6.      RLA of Boilers 3 x 200 MW (Stage-I) at NTPC-Farakka.

NASL/FARAKKA/

BOILER/RLA/WO/281: 00 dated 26th June, 2004.

NTPC Limited

Farakka Super Thermal Power Station, West Bengal

7.      RLA Study of Boiler & its Auxiliaries for Unit No. 2, 200 MW at NTPC-Singrauli.

UPL/1771/NTPC/

Singrauli/RLA dated May 25, 2004.

NTPC Limited

Singrauli Super Thermal Power Station, (U.P)

8.      RLA Study of Steam Drum for Power Boiler # 3 (AP-2).

UPL/1813/RNPL/RLA dated May 5, 2004.

Rama News Print & Papers Ltd., Barbodhan, Surat

03-04

1.      R&M and Life Extension Study of Unit No. 5 (30 MW) of Nampur TPS, ASEB including Performance Evaluation Test.

UPL/1727/ASEB/RLA dated January 8, 2004.

Assam State Electricity Board

Nampur Thermal Power Station

2.      RLA/LE Study of Boiler Pressure Parts and Pipings of Unit No. 1 at BALCO, Korba.

UPL/1796/Balco

dated November 18, 2003

Bharat Aluminium Company Limited,

Korba (Chhattisgarh)

3.      RLA Study of Pressure Parts of Boiler Unit No. 2 (100 MW).

UPL/1779/NTPC/

Badarpur dated September 17, 2003.

 

NTPC Limited

Badarpur Thermal Power Station

Badarpur, New Delhi

4.      RLA/LE Studies of Unit No. 6 & 7 of 100 MW Obra TPS.

UPL/763/Obra dated August 25, 2003.

Obra Thermal Power Station

02-03

1.      RLA/LE Study of Unit 1 & 2 (2 x 140 MW) of Nasik TPS (Boiler, Turbine & its Auxiliaries, Electricals, C & I, Coal Handling Plants, Civil Structures etc.).

UPL/1769/MSEB/Nasik/RLA dated June 12, 2002.

 

Nasik Thermal Power Station

 

2.      RLA Studies of Unit No. 1 (Boiler, Turbine & Its Auxiliaries, Electricals) of Vijayawada TPS.

UPL/1733/APPGCL dated

August 21, 2002

 

Vijayawada TPS

Year

Name of the Work

Work Order Reference No

 

Name and Address of Client

 

3.      RLA & LE Study of Unit No. 3, 110 MW (Boilers, Turbine & Electricals).

241/LOI/IRC dated 29th September 2002.

Tau Devi Lal Thermal Power Station, HPGCL Panipat

4.      RLA/LE Study of Boiler Pressure Parts and Pipings of Unit No. 2 at BALCO, Korba.

UPL/1770/BCPP dated October 9, 2002.

Bharat Aluminium Company Limited,

Korba (Chhattisgarh)

01-02

1.      RLA Study of 110 MW Unit No. 1 (Boiler, Turbines, Generator, Electricals, C&I, Civil Structures) of Panipat TPS.

UPL/1708/HPGCL/RLA dated November 17, 2001.

 

Panipat Thermal Power Station

2.      RLA Study of Unit No. 6 & 7 (Boiler, Turbine & Electricals) of 3 x 100 MW ‘B’ Obra TPS.

UPL/1703/Obra dated August 27, 2001

 

Obra Thermal Power Station

 

PART-II (TURBINE & AUXILIARIES)

Year

Name of the Work

Work Order Reference No

 

Name and Address of Client

09-10

1.      RLA Study of 210 MW LMW Turbine static components during the year 2009-10

SE/M.II/TTPS/DB/F.S. No. 241/

2009-10/D. 3906/09 dated 02/12/2009

Thoothukudi Thermal Power Station, Tamilnadu Electricity Board, Thoothukudi

2.      Residual Life Assessment Study of Turbine in Unit-3.

TSII/CONT/TM/T.NO.3483/5158

/2009 dated 29/10/2009

Neyveli Lignite Corporation Limited

Thermal Power Station-II

Neyveli, Tamil Nadu

3.      RLA Study of 60 MW Turbo Generator

VSP/WC/TPP/59210-0/OT/2009-10/8090000379 dated 23/10/2009

Rashtriya Ispat Nigam Limited

Visakhapatnam Steel Plant

Visakhapatnam, (A.P.)

4.      Remaining Life Assessment Study of Turbines.

CPP/CNT/MC-3367/WO/2009/1222 dated 30/07/2009

National Aluminium Co. Ltd.

Captive Power Plant, Angul

Orissa

08-09

1.      Residual Life Assessment/ Life Extension Study of Turbine & its Auxiliaries of 210 MW Unit No. 4

P.O.No.: GC 4625/CEG-I/SE (R&M)/Dr. NTTPS (VTPS)/RLA Study/D.No. 103/08 dated 18/10/2008

A.P. Power Generation Corporation Limited

Dr. Narla Tata Rao Thermal Power Station, Vijayawada (A.P.)

07-08

1.      RLA/LE Study of complete Boiler for Unit 1 & 3, Turbine and its Critical Piping for Unit No. 4.

CEG/340/KTPS-A/Unit No. 1, 3&4/

RLA/LE Study/Spec. 10/2007/D.No. 471/07 dated 05/10/2007

A.P. Power Gen. Corp. Ltd.

Kothagudem Thermal Power Station, Khammam,

Andhra Pradesh

2.      RLA & Recommendation for Steam Turbines of 114.8 MW rating of MHI.

AuGPS/C&M/06/034/LOA-06-100 dated 31/03/2007

NTPC Limited

Auraiya Gas Power Station

Auraiya (U.P.)

Year

Name of the Work

Work Order Reference No

 

Name and Address of Client

 

3.      RLA/LE Study of Boilers, Turbines & Auxiliaries of Unit No. 2 (210 MW).

GC 4345/CEG/112/VTPS-I/D.N. 9/07 dated 10/01/2007

A.P. Power Generation Corporation Limited

Vijayawada, Andhra Pradesh

04-05

1.      RLA Study of 5 Units of Turbines of 6 x 200 MW of NTPC-Vindhyachal.

NASL/VINDHYACHAL/RLA/WO/309:00 dated 15/10/2004

NTPC Limited

Vindhyachal Super Thermal Power Station

2.      RLA of Turbine & Auxiliaries of Unit No. 3 for NTPC-Ramagundam.

NASL/RAMAGUNDAM/RLA/WO/261:00 dated 5th March 2004

NTPC Limited

Ramagundam Super Thermal Power Station

3.      RLA Study of Turbine, Generator & Auxiliaries for (1 x 110 MW) Unit No. 6 of NTPC-TTPS.

UPL/1776/NTPC-TTPS dated July 1, 2003

NTPC Limited

Talcher Thermal Power Station

Talcher, Orissa

02-03

1.      RLA/LE Study of Unit No. 2 (Turbine, Electricals, C&I, Coal Handling Plant, Civil Structures.

 

UPL/1717/MSEB/RLA dated June 12, 2002.

 

Paras Thermal Power Station

 

2.      RLA/LE Study of Unit 1 & 2 (2 X 140 MW) of Nasik TPS (Boiler, Turbine & its Auxiliaries, Electricals, C & I, Coal Handling Plants, Civil Structures etc.)

 

UPL/1769/MSEB/Nasik/RLA dated June 12, 2002.

 

Nasik Thermal Power Station

 

3.      RLA Studies of Unit No. 1 (Turbine, Generator & Rotor) of Vijayawada TPS.

UPL/1733/APPGCL dated

August 21, 2002

 

Vijayawada TPS

Year

Name of the Work

Work Order Reference No

 

Name and Address of Client

 

4.      RLA & LE Study of Unit No. 3, 110 MW (Boilers, Turbine & Electricals).

241/LOI/IRC Dated 29th September 2002.

Tau Devi Lal Thermal Power Station, HPGCL Panipat

 

01-02

1.      RLA Study of 110 MW Unit No. 1 (Boiler, Turbines, Generator, Electricals, C&I, Civil Structures) of Panipat TPS.

UPL/1708/HPGCL/RLA dated November 17, 2001.

 

Panipat Thermal Power Station

2.      RLA Study of Unit No. 6 & 7 (Boiler, Turbine & Electricals) of 3 x 100 MW ‘B’ Obra TPS.

UPL/1703/Obra dated August 27, 2001

 

Obra Thermal Power Station

3.      RLA Studies of Unit Nos. 1, 2, 3 & 4 (Turbine & Electricals) at Koradi TPS (4 x 120 MW).

DG/KRD-1, 2, 3 & 4/R&M/T-148.

 

 

Koradi Thermal Power Station

4.      RLA of Turbine Generator of Unit No. III at Panki TPS.

UPL/771/Panki/Turbine dated November 9, 2000.

Panki Thermal Power Station, Panki, Kanpur