EXPERIENCE IN RESIDUAL LIFE ASSESSMENT STUDY
PART-I (BOILER & AUXILIARIES)
Year |
Name of the Work |
Work Order Reference No
|
Name and Address of Client |
10-11 |
1. Remnant Life Assessment Study of
Boiler No. 4. |
W.O.No.:
B/10-11/82 dated 09/07/2010 |
Indian Metals & Ferro Alloys Limited,
Choudwar-754 071, Cuttack, Orissa |
2. Remaining Life Assessment Study
of Unit-IV. |
P.O.No.:
4000046938-053-1010 dated 09/07/2010 |
NTPC Limited
Badarpur Thermal Power Station
Badarpur, New Delhi |
3. Remaining Life Assessment (RLA)
Test of 70 TPH Boiler. |
W.O.No.:
KC:CPD:TPH:CON:433 dated 06/07/2010 |
Kesoram Cement
Kesoram Industries Limited
Karimnagar, A.P. |
4. RLA Study of Boiler Pressure
Parts of WHRB #2 & #3. |
P.O.No.:
4000045430-050-1014 dated 19/06/2010 |
NTPC Limited
National Capital Power Station
Dadri (U.P.) |
5. Residual Life Assessment/Life
Extension Study of Boiler and ESP Performance Test in 210 MW Unit No. 6. |
P.O.No.:
GC 4874/CEG-I/SE(R&M)/Dr. NTTPS (Stage-III)/RLA Study/D.No. 83/10 dated
01/06/2010 |
A.P. Power Generation Corporation Limited
Dr. NTTPS (VTPS)
Vijayawada, AP |
6. Residual Life and Condition
Assessment Studies (RLA) of Boiler of Unit-II & III during Overhauls
2010-11. |
P.O.No.:
4000042202-053-1033 dated 15/04/2010 |
NTPC Limited
Ramagundam Super Thermal Power Station, Jyotinagar,
AP |
09-10 |
1. RLA Study of Coal Fired Boiler
No. 1. |
P.O.No.:
50002611/M03 dated 18/03/2010 |
The Andhra Pradesh Paper Mills Limited
Rajahmundry, Andhra Pradesh |
2. RLA & Life Extension of
OR-450 WHB System. |
P.O.No.:
4500020880 dated 10/03/2010 |
Paradeep Phosphates Limited
PPL Township
Paradeep: 754145 |
|
3. RLA Study of Boiler # 6 |
W.O.No.:
14031178/1049/3660 dated 03/03/2010 |
Hindalco Industries Limited Renusagar Power Division Renusagar, Sonebhadra (UP) |
| |
4. RLA Study of Boiler # C |
W.O.No.:
2500005422 dated 06/02/2010 |
Zuari Industries Limited
Zuari Nagar, GOA |
| |
5. Residual Life Assessment of 210
MW Boiler. |
BTPS/OMC/900599/2009-10/
143/7767
dated 11/01/2010 |
NTPC Limited
Badarpur Thermal Power Station
Badarpur, New Delhi |
| |
6. RLA Study of Boiler Stage-2
(2x500MW) at NTPC-Farakka. |
PO
No.: 4000036865-050-1024/238 dated 15/01/2010 |
NTPC Limited
Farakka Super Thermal Power Station |
| |
7. Remnant Life Assessment Study of
Boiler No. 2. |
B/09-10/216
dated 30/11/2009 |
Indian Metals & Ferro Alloys Limited,
Choudwar-754 071, Cuttack, Orissa |
| |
8. RLA Study as per Indian Boiler
Regulations with latest Amendments for Coal Fired Boiler No. 4 (MP-2837)
& Coal Fired Boiler No. 5 (AP-1738). |
W.O.No.:
50002385/ M03 dated 16/11/2009 |
The Andhra Pradesh Paper Mills Limited
Rajahmundry, Andhra Pradesh |
| |
9. RLA Study of Unit I Boiler. |
SE/R&M/TTPS/F.RLA/2009-10/
D.265/2009
dated 24/11/2009 |
Tamilnadu Electricity Board
Thoothukudi Thermal Power Station, Thoothukudi |
| |
10. Contract for Residual Life Assessment
(RLA) Study for WHRB #3 and #4. |
P.O.
No.: 4000032050-050-1012 dated 23/10/2009 |
NTPC Limited
Auraiya Gas Power Station
Auraiya (U.P.) |
| |
11. Residual Life Assessment of 95
MW Unit. |
P.O.No.:
4000026944-050-1010/6240 dated 01/09/2009 |
NTPC Limited
Badarpur Thermal Power Station
Badarpur, New Delhi |
Year |
Name of the Work |
Work Order Reference No
|
Name and Address of Client |
|
12. Residual Life Assessment Study
of one 500 MW Boiler (Unit #6). |
P.O.No.:
4000028263-053-1004 dated 21/08/2009 |
NTPC Limited
Singrauli Super Thermal Power Station, Sonebhadra
(U.P.) |
|
13. Complete Residual Life
Assessment Study and Inspection Activities of 151 TPH CFBC Boiler. |
W.O.No.:
8802598 dated 19th Aug, 2009 |
NAVA Bharat Ventures Limited
Paloncha, Khammam Distt.
Andhra Pradesh |
14. Remaining Life Assessment of 75
TPH Russian Boiler at Gujarat Refinery. |
W.O.No.:
17967292 dated 16/07/2009 |
Indian Oil Corporation Ltd.
Gujarat Refinery,
Vadodara, Gujarat |
15. RLA Study of Coal Fired Boiler
No. 2 (Ap-701) & Coal Fired Boiler No. 3 (MP-2839) as per Indian Boiler
Regulations. |
P.O.No.:
50002172/M03 dated 09/07/2009 |
The Andhra Pradesh Paper Mills Limited
Rajahmundry,
East Godavari Distt. (A.P.) |
16. Residual Life Assessment Study
on Boiler-2 in TPS-II. |
LOI
No.: TS-II/Cont/BM/T.No.3467
/5147/2009
dated 07/07/2009 |
Neyveli Lignite Corporation Limited, Thermal Power
Station-II, Neyveli, Tamil Nadu |
17. Remaining Life Assessment and
Condition Assessment (RLA & CA) of SG-3. |
LOI
No.: HWPM/MU/2009/BG/111 dated 23/06/2009 |
Department of Atomic Energy
Heavy Water Plant, Manuguru
Andhra Pradesh |
18. Remaining Life Assessment Study
(RLA) of 3 Nos. of Boilers (J.T. Boiler, T.V. Boiler & Oscatz Boiler). |
W.O.No.:
02/09/M4/1001 dated 02/06/2009. |
The Andhra Sugars Limited
Tanuku, Andhra Pradesh |
19. Residual Life Assessment of
Boiler and Associated System of any one unit of 110 MW at NTPC-Tanda. |
P.O.No.:
4000021475-050-1007/853 dated 07/05/2009 |
NTPC Limited
Tanda Thermal Power Station
Vidyut Nagar, U.P. |
20. RLA Study of Boiler #1 (80 TPH
WIL Boiler) for IBR 391-A, Table –I. |
W.O.No.:
CC/AMC/09-10/006 dated 16/04/2009. |
Hindalco Industries Limited
Renukoot, Sonebhadra, U.P. |
08-09 |
1. NDT of Drums and Headers of
Russian Boilers of Power and Blowing Station. |
W.O.No.:
DGM/CC/CAM/2132/PP-I/OT/PA/312/2008/1116 dated 20/03/2009 |
Steel Authority of India Ltd.
Bhilai Steel Plant
Bhilai, Chhattisgarh |
Year |
Name of the Work |
Work Order Reference No
|
Name and Address of Client |
|
2. Remaining Life Assessment of
Steam Generator (SG Boiler) of Power Plant. |
W.O.No.:
WO/A1/RS/20081010 dated 20th February 2009. |
Indian Farmers Fertilizer Cooperative Limited
Aonla Unit, Bareilly, U.P. |
3. Residual Life Assessment (RLA)
test for Six John Thomson Fired Boilers. |
P.O.No.:
763/4500132454 dated 24/01/2009 |
The Sirpur Paper Mills Limited
Sirpur Kaghaznagar, A.P. |
4. Residual Life Assessment Study
on Boiler-3 in TPS-II. |
LOI No.:
SII/CONT/BM/T.NO.3416
/5131/2008 dated 17/12/2008 |
Neyveli Lignite Corporation Limited, Thermal Power
Station-II, Neyveli, Tamil Nadu |
5. Remaining Life Assessment and
Condition Assessment (RLA & CA) of SG-2. |
LOI No.: HWPM/MU/2008/BG/98
dated 27/11/2008 |
Department of Atomic Energy
Heavy Water Plant, Manuguru
Andhra Pradesh |
6. RLA Study of Stage-I Boilers. |
P.O.
No.: 4000011182-053-1027 dated 24/11/2008 |
NTPC Limited
Talcher Thermal Power Station
Angul, Orissa |
7. RLA Study of 2 Nos. (1 x 32 TPH
and 1 x 36 TPH) Steam Boilers. |
W.O.No.:
Comml/Cntr/2008-2009/9430 dated 18/11/2008 |
BILT Graphic Paper Products Limited, Kamalapuram |
8. RLA Study of 75 MT/Hr. capacity
Russian Boilers (B-1 & B-2) at Barauni Refinery. |
W.O.No.:
17816698/2394 dated 18/09/2008 |
Indian Oil Corporation Limited
Barauni Refinery
Begusarai, Bihar |
9. RLA Study of 2 x 145 TPH CFBC
Boilers at Hindalco Industries Limited-Hirakud. |
P.O.No.:
900818/JE1213 dated 22/09/2008 |
Hindalco Industries Limited
Hirakud (Orissa)/ ISGEC John Thompson |
10. Remnant Life Assessment of Coal
Fired Boilers (3 Nos.) |
P.O.No.:
561704 dated 08/09/2008 |
Hindustan Newsprint Limited
Kottayam, Kerala |
11. RLA Study of 2 Nos. WHRBs of 108
MW Rithala CCPP as per IBR Act 1950 Clause 391 A and submission of reports
approved by CIB, Delhi. |
P.O.No.:
3500003211 dated 09/09/2008 |
North Delhi Power Limited (A TATA Power and Delhi
Government Joint Venture)
Rithala, New Delhi |
Year |
Name of the Work |
Work Order Reference No
|
Name and Address of Client |
|
12. RLA Study of Boiler No. 2 and
RLA Study of Main Stream Line Header. |
W.O.No.:
HP/22/22/0600/06CE0742
/WO
20860 dated 21/08/2008 |
Krishak Bharati Cooperative Limited, Kribhco Nagar,
Surat, Gujarat |
13. Work of Condition Assessment and
Residual Life Assessment Study of WHRB (Boiler), Unit No. 2 (GT 3132 & GT
3133) of GBPS, Utran. |
W.O.No.:
UGBPS/MECH II/BMD/
RLA-BOILER
#2/2008/3935 dated 21/08/2008 |
Gujarat State Electricity Corporation Limited,
Gas Based Power Station, Utran |
14. Carrying out Residual Life
Assessment (RLA) in Unit-I during 2008-09 Overhauls and Piping Stress
Analysis. |
P.O.
No.: 4000006605-053-1033 dated 29/08/2008 |
NTPC Limited
Ramagundam Super Thermal Power Station
Andhra Pradesh |
15. RLA of 95 MW Unit. |
LOA
No.: 300010/BTPS/OMC/0809
/21
dated 23/07/2008 |
NTPC Limited
Badarpur Thermal Power Station
Badarpur, New Delhi |
16. Remaining Life Assessment Study
of Boiler Pressure Parts. |
W.O.No.:
CPP/CNT/MC-3163/WO/
2008/1934
dated 01/07/2008 |
National Aluminium Company Limited, Angul (Orissa) |
17. Residual Life Assessment Study
of Boiler & Auxiliaries in one unit of 500 MW. |
LOA No.: C&M/11079
dated 13/06/2008 |
NTPC Limited
Singrauli Super Thermal Power Station, Shaktinagar
(U.P.) |
18. Remaining Life Assessment &
Condition Assessment (RLA & CA) of SG # 1. |
W.O.No.:
HWPM/MU/2007/BG/71 A/ R1 dated 12/06/2008 |
Department of Atomic Energy
Heavy Water Plant, Manuguru
Andhra Pradesh |
19. RLA Study of Service Boiler. |
P.O.No.:
4720000693 dated 22./04/2008 |
TATA Chemicals Limited
Babrala, (U.P.) |
07-08 |
1. Remnant Life Assessment (RLA) of
01 No. Heat Recovery Steam Generator (HRSG #1) of Power Plant. |
W.O.No.:
4110/268/S&P 582/IW/07/
1032
(X) dated 18/01/2008 |
Indian Farmers Fertilizers Cooperative Limited
Aonla Unit, Bareilly |
2. Residual Life Analysis of Boiler
‘A’ |
W.O.No.:
ZIL/PURAIK/24350 dated
04/12/2007 |
Zuari Industries Limited
Zuarinagar, GOA |
3. Remnant Life Assessment Study of
Boiler No. 3. |
W.O.No.:
B/07-08/117 dated 21/11/2007 |
Indian Metals & Ferro Alloys Ltd., Cuttack
(Orissa) |
Year |
Name of the Work |
Work Order Reference No
|
Name and Address of Client |
|
4. RLA of Boiler and Associated
System of any one Unit of 110 MW. |
W.O.No.:
NTPC/TD/CS/24/3294/
LOI-2975/675
dated 07/11/2007 |
NTPC Limited
Tanda Thermal Power Station
Vidyut Nagar (U.P.) |
5. RLA Study of KTI Boiler at
Cogeneration Plant, Hazira. |
HZR/OPS/AM5/58/07-08
dated 17/10/2007 |
Oil & Natural Gas Corporation Limited,
Cogeneration Plant
Hazira (Gujarat) |
6. RLA/LE Study of complete Boiler for
Unit 1 & 3, Turbine and its Critical Piping for Unit No. 4. |
CEG/340/KTPS-A/Unit No. 1, 3&4/
RLA/LE Study/Spec. 10/2007/D.No.
471/07 dated 05/10/2007 |
A.P. Power Gen. Corp. Ltd.
Kothagudem Thermal Power Station,
Khammam,
Andhra Pradesh |
7. RLA Study of 2 Nos. of Boilers. |
SSK/PUR/ENG/136/1378/07-08 dated
04/10/2007 |
Sanjivani Sahakari Sakhar Karkhana
Limited (GOA) |
8. RLA Test of Boilers No. 09, 10, 11
& 12. |
W.O.No.: bk/2449 dated 19/07/2007 |
Saraswati Sugar Mills Ltd.
Yamuna Nagar (Haryana) |
9. RLA Study of Boiler Pressure Parts,
Auxiliaries Piping and Structures in #4. |
08/CS1/TH/BMD/MTC/3239/LOI-188/2007 |
NTPC Limited
National Capital Power Station
Dadri (U.P.) |
10. RLA Study of Pressure Parts of
Boiler # 3, Type VU-60 of BHEL Capacity 150 TPS. |
Award Letter No.: 7013/OA-7011
dated 25/07/2007 |
NTPC-SAIL Power Company Private
Limited
Bhilai, Chhattisgarh |
11. Condition Assessment Study of
Unit V & VI Boiler Components during Overhaul 07-08. |
W.O.No.:
13680 dated 29/06/2007 |
NTPC Limited
Ramagundam Super Thermal Power Station |
12. RLA of Boiler of 210 MW (Unit 1
& 4) of Stage-I. |
KhS:092:CS:O&M/1001/2656/631
dated 13/06/2007 |
NTPC Limited
Kahalgaon Super Thermal Power Station
Bhagalpur, Bihar |
Year |
Name of the Work |
Work Order Reference No
|
Name and Address of Client |
|
13. RLA of Waste Heat Boiler. |
HCL/KCC/SMLT/MECH/646/2007
dated 19/05/2007 |
Hindustan Copper Limited
Khetri |
06-07 |
1. RLA Study of Pressure Parts of
Boiler # 2, Type VU-40 of BHEL Capacity 150 TPS. |
Award
Letter No.: 6101/OA-6033 dated 24/02/2007 |
NTPC-SAIL Power Company Private Limited
Bhilai, Chhattisgarh |
2. RLA/LE Study of Boilers,
Turbines & Auxiliaries of Unit No. 2 (210 MW). |
GC
4345/CEG/112/VTPS-I/D.N. 9/07 dated 10/01/2007 |
A.P. Power Generation Corporation Limited
Vijayawada, Andhra Pradesh |
3. RLA Study of 140 MW Boilers of
Stage-II Units, Dhuvaran. |
DTPS/AC/Works/173/BMD/6296
dated 05/12/2006 |
Gujarat State Electricity Corporation Limited
Dhuvaran Thermal Power Station, Gujarat |
4. NDT/RLA of CO Boiler at KRL. |
UPL/1860/KRL/RLA
dated 17/11/2006 |
Kochi Refineries Limited
Ernakulam, Kerala |
5. RLA Study of Boiler No. 1 |
B/06-07/121
dated 27/10/2006 |
Indian Metals & Ferro Alloys Limited, Cuttack
(Orissa) |
6. RLA Study of # 1 Boiler &
Pressure Parts at Ib TPS (210 MW). |
ITPS/CC-EL-197
(H)/709/WI dated 18/08/2006 |
Orissa Power Generation Corporation Limited
Ib Thermal Power Station
Jharsuguda |
7. RLA Study of Boiler No. 10615 in
Ammonia V Plant of RCF, Trombay Unit. |
UPL/RCFL/RLA/02 dated 05/05/2006 |
Rashtriya Chemicals &
Fertilizers Limited
Bombay/ UPL |
05-06 |
1. RLA Study of Boiler No. 10236 of
MP-Nitric Acid Plant of RCF, Trombay Unit. |
UPL/RCFL/RLA/01 dated 06.02.2006. |
Rashtriya
Chemicals & Fertilizers Ltd., Mumbai |
2. RLA of 1 No. of HRSG of Power Plant
at IFFCO. |
UPL/1842/IFFCO/RLA dated December 12, 2005 |
Indian Farmers Fertilizers Cooperative Limited
Bareilly, (U.P.) |
Year |
Name of the Work |
Work Order Reference No
|
Name and Address of Client |
|
3. RLA/LE Study of Boiler No. 5,
GT-2391 of IOP Plant at Vadodara (Gujarat). |
UPL/1829-A/IPCL/RLA dated December 8, 2005. |
Indian Petrochemicals Corporation Ltd.,
Vadodara (Gujarat) |
4. RLA Study of 1 x 110 MW (6th Unit) of Boiler at DPPS/DPL. |
UPL/1849/DPL/RLA dated December 8, 2005. |
DPPS, Durgapur
|
5. RLA of Waste Heat Recovery Boiler
(WHRB # 1) of 210 TPH (50 MW) rating of MHI Make. |
UPL/1815/NTPC/RLA dated August 31, 2005. |
NTPC Limited
Auraiya Gas Power Station
Auraiya, (U.P.) |
6. RLA of Waste Heat Recovery Boiler
(WHRB # 2) of 210 TPH (50 MW) rating of MHI Make. |
UPL/1815/NTPC/RLA dated July 15, 2005. |
NTPC Limited
Auraiya Gas Power Station
Auraiya, (U.P.) |
7. RLA Tests in Boiler Nos. GT-1618
& GT-1619. |
UPL/1843/SKVSKUML/RLA dated June 11, 2005. |
Shree Kamrej Vibhag Sahakari Khand Udyog Mandli Ltd.,
Surat (Gujarat) |
04-05 |
1. RLA of Waste Heat Recovery Boiler
(WHRB # 4) of 210 TPH (50 MW) rating of MHI Make. |
UPL/1815/NTPC/RLA dated July 15, 2005. |
NTPC Limited
Auraiya Gas Power Station
Auraiya, (U.P.) |
2. RLA Study of VU-40, Boilers No. 2
& 3 of Phulpur Unit 1. |
UPL/1811/IFFCO/RLA dated February 10, 2005. |
Indian Farmers Fertilizers Cooperative Limited
Phulpur |
3. RLA Study of Power Boiler at
Mathura Refinery. |
UPL/1807/IOCL/RLA dated December 2, 2004. |
Indian Oil Corporation Limited
Mathura Refinery |
4. RLA Study of Boiler |
UPL/1831/Reliance-Hazira/RLA dated December 2, 2004 |
Reliance-Hazira Plant (Gujarat) |
5. RLA of Waste Heat Recovery Boiler
(WHRB) of 210 TPH (50 MW). |
UPL/1815/NTPC/RLA dated September 1, 2004. |
NTPC Limited
Auraiya Gas Power Station
Auraiya, (U.P.) |
Year |
Name of the Work |
Work Order Reference No
|
Name and Address of Client |
|
6. RLA of Boilers 3 x 200 MW (Stage-I)
at NTPC-Farakka. |
NASL/FARAKKA/
BOILER/RLA/WO/281: 00 dated 26th June,
2004. |
NTPC Limited
Farakka Super Thermal Power Station, West Bengal |
7. RLA Study of Boiler & its
Auxiliaries for Unit No. 2, 200 MW at NTPC-Singrauli. |
UPL/1771/NTPC/
Singrauli/RLA dated May 25, 2004. |
NTPC Limited
Singrauli Super Thermal Power Station, (U.P) |
8. RLA Study of Steam Drum for Power
Boiler # 3 (AP-2). |
UPL/1813/RNPL/RLA dated May 5, 2004. |
Rama News Print & Papers Ltd., Barbodhan, Surat |
03-04 |
1. R&M and Life Extension Study of
Unit No. 5 (30 MW) of Nampur TPS, ASEB including Performance Evaluation Test. |
UPL/1727/ASEB/RLA dated January 8, 2004. |
Assam State Electricity Board
Nampur Thermal Power Station |
2. RLA/LE Study of Boiler Pressure
Parts and Pipings of Unit No. 1 at BALCO, Korba. |
UPL/1796/Balco
dated November 18, 2003 |
Bharat Aluminium Company Limited,
Korba (Chhattisgarh) |
3. RLA Study of Pressure Parts of
Boiler Unit No. 2 (100 MW). |
UPL/1779/NTPC/
Badarpur dated September 17, 2003.
|
NTPC Limited
Badarpur Thermal Power Station
Badarpur, New Delhi |
4. RLA/LE Studies of Unit No. 6 &
7 of 100 MW Obra TPS. |
UPL/763/Obra dated August 25, 2003. |
Obra Thermal Power Station |
02-03 |
1. RLA/LE Study of Unit 1 & 2 (2 x
140 MW) of Nasik TPS (Boiler, Turbine & its Auxiliaries, Electricals, C
& I, Coal Handling Plants, Civil Structures etc.). |
UPL/1769/MSEB/Nasik/RLA dated June 12, 2002.
|
Nasik Thermal Power Station
|
2. RLA Studies of Unit No. 1 (Boiler,
Turbine & Its Auxiliaries, Electricals) of Vijayawada TPS. |
UPL/1733/APPGCL dated
August 21, 2002
|
Vijayawada TPS |
Year |
Name of the Work |
Work Order Reference No
|
Name and Address of Client |
|
3. RLA & LE Study of Unit No. 3,
110 MW (Boilers, Turbine & Electricals). |
241/LOI/IRC dated 29th September 2002. |
Tau Devi Lal Thermal Power Station, HPGCL Panipat |
4. RLA/LE Study of Boiler Pressure
Parts and Pipings of Unit No. 2 at BALCO, Korba. |
UPL/1770/BCPP dated October 9, 2002. |
Bharat Aluminium Company Limited,
Korba (Chhattisgarh) |
01-02 |
1. RLA Study of 110 MW Unit No. 1
(Boiler, Turbines, Generator, Electricals, C&I, Civil Structures) of
Panipat TPS. |
UPL/1708/HPGCL/RLA dated November 17, 2001.
|
Panipat Thermal Power Station |
2. RLA Study of Unit No. 6 & 7 (Boiler,
Turbine & Electricals) of 3 x 100 MW ‘B’ Obra TPS. |
UPL/1703/Obra dated August 27, 2001
|
Obra Thermal Power Station |
PART-II (TURBINE & AUXILIARIES)
Year |
Name of the Work |
Work Order Reference No
|
Name and Address of Client |
09-10 |
1. RLA Study of 210 MW LMW Turbine
static components during the year 2009-10 |
SE/M.II/TTPS/DB/F.S.
No. 241/
2009-10/D.
3906/09 dated 02/12/2009 |
Thoothukudi Thermal Power Station, Tamilnadu
Electricity Board, Thoothukudi |
2. Residual Life Assessment Study
of Turbine in Unit-3. |
TSII/CONT/TM/T.NO.3483/5158
/2009
dated 29/10/2009 |
Neyveli Lignite Corporation Limited
Thermal Power Station-II
Neyveli, Tamil Nadu |
3. RLA Study of 60 MW Turbo
Generator |
VSP/WC/TPP/59210-0/OT/2009-10/8090000379
dated 23/10/2009 |
Rashtriya Ispat Nigam Limited
Visakhapatnam Steel Plant
Visakhapatnam, (A.P.) |
4. Remaining Life Assessment Study
of Turbines. |
CPP/CNT/MC-3367/WO/2009/1222
dated 30/07/2009 |
National Aluminium Co. Ltd.
Captive Power Plant, Angul
Orissa |
08-09 |
1. Residual Life Assessment/ Life Extension
Study of Turbine & its Auxiliaries of 210 MW Unit No. 4 |
P.O.No.:
GC 4625/CEG-I/SE (R&M)/Dr. NTTPS (VTPS)/RLA Study/D.No. 103/08 dated
18/10/2008 |
A.P. Power Generation Corporation Limited
Dr. Narla Tata Rao Thermal Power Station, Vijayawada
(A.P.) |
07-08 |
1. RLA/LE Study of complete Boiler
for Unit 1 & 3, Turbine and its Critical Piping for Unit No. 4. |
CEG/340/KTPS-A/Unit No. 1, 3&4/
RLA/LE Study/Spec. 10/2007/D.No.
471/07 dated 05/10/2007 |
A.P. Power Gen. Corp. Ltd.
Kothagudem Thermal Power Station,
Khammam,
Andhra Pradesh |
2. RLA & Recommendation for
Steam Turbines of 114.8 MW rating of MHI. |
AuGPS/C&M/06/034/LOA-06-100
dated 31/03/2007 |
NTPC Limited
Auraiya Gas Power Station
Auraiya (U.P.) |
Year |
Name of the Work |
Work Order Reference No
|
Name and Address of Client |
|
3. RLA/LE Study of Boilers,
Turbines & Auxiliaries of Unit No. 2 (210 MW). |
GC 4345/CEG/112/VTPS-I/D.N. 9/07
dated 10/01/2007 |
A.P. Power Generation Corporation
Limited
Vijayawada, Andhra Pradesh |
04-05 |
1. RLA Study of 5 Units of Turbines of
6 x 200 MW of NTPC-Vindhyachal. |
NASL/VINDHYACHAL/RLA/WO/309:00
dated 15/10/2004 |
NTPC Limited
Vindhyachal Super Thermal Power
Station |
2. RLA of Turbine & Auxiliaries of
Unit No. 3 for NTPC-Ramagundam. |
NASL/RAMAGUNDAM/RLA/WO/261:00 dated
5th March 2004 |
NTPC Limited
Ramagundam Super Thermal Power
Station |
3. RLA Study of Turbine, Generator
& Auxiliaries for (1 x 110 MW) Unit No. 6 of NTPC-TTPS. |
UPL/1776/NTPC-TTPS dated July 1,
2003 |
NTPC Limited
Talcher Thermal Power Station
Talcher, Orissa |
02-03 |
1. RLA/LE Study of Unit No. 2
(Turbine, Electricals, C&I, Coal Handling Plant, Civil Structures.
|
UPL/1717/MSEB/RLA dated June 12,
2002.
|
Paras Thermal Power Station
|
2. RLA/LE Study of Unit 1 & 2 (2 X
140 MW) of Nasik TPS (Boiler, Turbine & its Auxiliaries, Electricals, C
& I, Coal Handling Plants, Civil Structures etc.)
|
UPL/1769/MSEB/Nasik/RLA dated June
12, 2002.
|
Nasik Thermal Power Station
|
3. RLA Studies of Unit No. 1 (Turbine,
Generator & Rotor) of Vijayawada TPS. |
UPL/1733/APPGCL dated
August 21, 2002
|
Vijayawada TPS |
Year |
Name of the Work |
Work Order Reference No
|
Name and Address of Client |
|
4. RLA & LE Study of Unit No. 3,
110 MW (Boilers, Turbine & Electricals). |
241/LOI/IRC Dated 29th September 2002. |
Tau Devi Lal Thermal Power Station,
HPGCL Panipat
|
01-02 |
1. RLA Study of 110 MW Unit No. 1
(Boiler, Turbines, Generator, Electricals, C&I, Civil Structures) of
Panipat TPS. |
UPL/1708/HPGCL/RLA dated November
17, 2001.
|
Panipat Thermal Power Station |
2. RLA Study of Unit No. 6 & 7
(Boiler, Turbine & Electricals) of 3 x 100 MW ‘B’ Obra TPS. |
UPL/1703/Obra dated August 27, 2001
|
Obra Thermal Power Station |
3. RLA Studies of Unit Nos. 1, 2, 3
& 4 (Turbine & Electricals) at Koradi TPS (4 x 120 MW). |
DG/KRD-1, 2, 3 &
4/R&M/T-148.
|
Koradi Thermal Power Station |
4. RLA of Turbine Generator of Unit No.
III at Panki TPS. |
UPL/771/Panki/Turbine dated
November 9, 2000. |
Panki Thermal Power Station, Panki,
Kanpur |
|